This Dynamic versus As-planned v As-built Critical Path Calculator Sheet has 10 Updates with an average of 5000 activities per update it took 328 seconds to build via computer code.

The video on the right has 10 updates and one baseline. There are 5000 average activities per update. It takes 328 seconds to construct the Dynamic versus As-planned v As-built Calculation Sheet. This is direct from P6 Database tables and this includes a full WBS split into WBS name titles to easily sort and filter out sections of work. 

Planned v Actual Progress Graphs based on S curves can be produced for an WBS filter. 

This Dynamic versus As-planned v As-built Critical Path Calculator Sheet has 10 Updates with an average of 10000 activities per update it took 464 seconds to build via computer code.

The video on the right has 10 updates and one baseline. There are 10000 average activities per update. It takes 464 seconds to construct the Dynamic versus As-planned v As-built Calculation Sheet. This is direct from P6 Database tables and this includes a full WBS split into WBS name titles to easily sort and filter out sections of work. 

Planned v Actual Progress Graphs based on S curves can be produced for an WBS filter. 